Reduce warehouse labour costs. Protect service.

Improve productivity, avoid unnecessary cover, release planning time and turn site experience into shared learning. Balance cost and service throughout.

Explore your labour opportunity ↗
Labour productivityAgency & overtimePlanning & scenariosSite & network performance
The savings opportunity

Two sources of savings. One labour budget.

Productivity improvements and reduced agency and overtime together underpin the potential to save 5% of your annual labour budget.

Potential saving, not a guaranteed result. The contribution of each benefit varies by operation; savings are counted once, without overlap. Results depend on your starting point, operating constraints and adoption.

Planning efficiency is a separate benefit: less administration gives your team more time to act.

What could this mean for your warehouse? Discuss an assessment →

01 / LABOUR PRODUCTIVITY

Complete the work with fewer labour hours.

A fixed processing rate assumes that every additional unit takes the same effort. In practice, productivity changes with the amount and mix of work. A picking journey can collect one item or several; too much work at once can also create congestion.

Predyktable uses operating history to estimate how productivity changes with workload. It then compares feasible work patterns across tasks and days, within your deadlines, available labour and capacity. The aim is to reduce the total hours needed to complete the work.

Same workload. Better timing. Fewer labour hours.

Before: plan with a fixed rate

The plan assumes each unit takes the same effort. It can miss opportunities to use more productive workload levels across tasks and days.

After: plan around productivity

Predyktable predicts how processing rates change with workload, then compares when to group or spread flexible work to reduce total labour hours.

The whole plan counts. A gain in one department or day must not create more work elsewhere. Compare total hours across the plan while keeping capacity and service commitments in view.

Illustrative mechanism, not a customer result. Both plans must meet the same workload and service requirements. Changes depend on work availability, deadlines, staffing and capacity; higher volumes do not always improve productivity.

Measure the hours needed for comparable work

Compare labour hours against similar workload, work mix and service commitments. Check the whole plan, including quieter periods, rather than counting an improvement on one day alone.

02 / AGENCY & OVERTIME

Buy the cover you need. Avoid the hours you don’t.

A balanced weekly total can hide a shortage on Tuesday and unused hours on Thursday. By the time that mismatch is visible, agency may already be booked and overtime may be the only practical response.

Predyktable compares workload, backlog and available labour across the plan. Bring forward work that has arrived, defer eligible work within its service window, or use suitable available capacity before buying extra cover. Check the effect on later days so today’s saving does not become tomorrow’s problem.

1. See the mismatch

Compare labour needs with available and committed hours.

2. Check what can change

Account for skills, notice periods, minimum bookings and deadlines.

3. Commit the right cover

Review alternatives and retain extra hours where service needs them.

Measure the saving in agency and overtime spend.

Compare what you spent delivering similar work at the same service level, allowing for any replacement labour costs. If existing paid hours cover the work, count the avoided agency or overtime spend once.

03 / PLANNING EFFICIENCY & SCENARIOS

Spend less time rebuilding plans. More time testing decisions.

Collecting inputs, rebuilding calculations and reconciling spreadsheets can consume the time planners need to consider alternatives. Connected inputs and repeatable calculations reduce that administration when a plan needs updating.

Keep one approved plan for the operation, with proposed changes and what-if scenarios clearly separate. Planners and shift managers can see which version applies, what changed and why.

Approved planYour agreed starting point
What-if scenarioChange defined assumptions
Compare the impactHours · cost · backlog · service

Prepare for peak

Would different shift patterns or a different permanent-and-agency mix cover demand more effectively? Test the assumptions before committing hours.

Prepare for disruption

If a conveyor were unavailable for two days, what would happen to backlog and service? Compare recovery options before the disruption occurs.

Scenarios help your team evaluate choices; they do not automatically change the approved plan or prescribe a hiring strategy.

85%

Less planning administration

Less time on administration.
More time for planning decisions.

Customer-reported 85% reduction in planning administration time. Results vary by operation and adoption. See the evidence →

Measure time released and how it is used

Compare administration effort for equivalent planning tasks, including work outside the platform. Track the scenarios assessed and decisions informed separately. Time released is planning capacity; it becomes a cash saving only where expenditure is avoided.

04 / SITE & NETWORK PERFORMANCE

Make every site’s experience count.

Predyktable connects plan history with available operational results so teams can investigate recurring problems.

Follow rising agency spend to the site, department and task behind it. Was workload information late? Was a productivity assumption unrealistic? Or did a tight service window justify extra cover? Use the plan history to investigate what happened and why.

Follow the issue downShare the learning back up
  1. Network

    Where is cost or service pressure recurring?

  2. Region

    Is the pattern shared by a group of warehouses?

  3. Warehouse

    Which site conditions or decisions need attention?

  4. Department

    Where is the workload or capacity mismatch?

  5. Task

    Which assumption, constraint or change should we test?

Turn site experience into network improvement.
Understand what worked, share why it worked and apply the learning where similar conditions exist.

Illustrative investigation path. Regional groupings, reporting views and access are configured to your organisation and connected data.

Turn everyday decisions into shared operational knowledge.

Retain plans, revisions, approvals and recorded context so handovers and team changes do not erase the reasoning behind decisions.

Share what works

Test a change locally, review its outcome, then share the conditions and lessons with other sites. Check local work mix, equipment and service before applying it elsewhere.

For warehouse managers, this helps improve the next shift and plan. For network leaders, it identifies recurring constraints and where support, skills or capacity deserve attention.

The Warehouse Initial Setup Engine (WISE) establishes shared definitions during rollout. What teams can see depends on connected data and their access permissions.

See how WISE supports network rollout →

Connect learning to measurable improvement

Shared operational knowledge supports better decisions. Any resulting labour, agency or overtime saving is counted once in the relevant benefit, rather than added again as a separate saving.

What could these benefits mean for your warehouse?

A Labour Opportunity Assessment uses your labour costs and operating baseline to estimate the potential value.